How to calculate
Use rise and horizontal run for sloped length and angle. Where truss spacing is needed, count whole bays plus both end trusses.
Worked example
Use Full gable span (ft) 20 · Vertical rise (ft) 5 · Length along the ridge (ft) 24 · Maximum truss spacing (in) 24 · Horizontal overhang per side (ft) 0. The result is ≈ 13 trusses.
Input and result notes
Uses straight roof geometry and excludes member sizing, member cuts and connection design.
OpenStax right triangle trigonometry